Anwendungen

Microgrid and island power system testing

Black start, grid-connect and island transfer, multi-source coordination and capacity verification for industrial park, island and remote-area microgrids.

Wesentliche Prüfanforderungen

  • Transient capture across grid-connect and island transfers
  • Coordinated loading across genset, PV and storage sources
  • Black-start and load-pickup verification
  • Megawatt-scale step loading with remote control

The core questions

A microgrid combines diesel generation, PV, storage converters and local load, and the controller has to manage transfer between grid-connected and islanded operation, frequency and voltage support and power redistribution within a few hundred milliseconds. That behaviour can only be verified with real controllable load; simulation results are not a substitute.

Test items

Typical items: voltage and frequency transients on planned and unplanned islanding; load-step response while islanded; power-sharing accuracy between storage and generation; the ability to pick up load in stages during a black start; and stability across a range of load power factors.

Load equipment configuration

Microgrid work needs load banks that step quickly, resolve finely and support inductive and capacitive loading, driven by a test control system that runs the load profile from a script and records all electrical quantities. On site, containerised and mobile banks are the practical choice for transport and for paralleling to reach the required capacity.

Empfohlene Ausrüstung

Sie brauchen Konfiguration und Angebot für Ihr Prüfobjekt? Unsere Prüfingenieure antworten innerhalb eines Werktags.

Ingenieur kontaktieren

Weitere Anwendungen