Aplicaciones

EV powertrain and e-drive testing

From motor and e-axle development testing to end-of-line production testing: efficiency maps, endurance runs, NVH order analysis and full data traceability.

Requisitos clave de ensayo

  • High-dynamic dynamometers covering the full torque-speed envelope
  • Efficiency mapping with a system-level uncertainty budget
  • EOL stations at 30 to 90 second cycle times
  • Raw-data traceability archived by serial number

Splitting development benches from EOL stations

Development benches are built for measurement accuracy, operating-point coverage and complete data capture; a single run can last tens of hours while mapping efficiency, validating thermal strategy or completing endurance schedules. EOL stations are built for cycle time and consistent judgement; their job is to catch assembly defects, not to re-characterise the product. The two specifications should be written separately.

The measurement chain behind an efficiency map

Efficiency uncertainty comes from the torque transducer, speed measurement, power analyser, temperature compensation and sampling synchronisation acting together. A ±0.1% FS transducer with poor shaft alignment, or sampled out of phase with the electrical measurement, can give an error several times larger than the sensor rating suggests. At acceptance, ask for a system-level uncertainty budget and verify repeatability with a reference motor of known efficiency.

NVH judgement on the line

Order analysis is the core of e-drive NVH judgement. Collect order-amplitude distributions from a few hundred known-good units early in production, set initial limits statistically, then refine them against rework and field-complaint data. Fixed thresholds carried over from a previous programme usually stop working after a gear supplier or batch change.

The data platform

Raw waveforms, judgements, equipment status and calibration validity should all be tied to the serial number and archived long-term. The LANDI LDEV-X platform logs up to 1000 channels at 1 kHz with automatic report generation, and together with the LD-LMS laboratory management system covers the path from execution to archiving and retrieval.

Equipos recomendados

¿Necesita una configuración y presupuesto para su equipo? Nuestros ingenieros responden en un día laborable.

Hablar con un ingeniero

Otras aplicaciones